The scratch
coat for the stucco has been put on the house and the bottom of the framing
on the windows has been installed. The front porch is almost done
and they are making all kinds of headway inside. The
inside has the ac duct work, electrical, sheet rock, and spackling
are all done as well as the ceramic tile. The kitchen cabinets and bathroom
cabinets are in and the pool is almost done.. Getting real close. Our move
in date is Oct 24, 2005.
As of September 28, 2005
The garage 6/22/04
|
The front od the house 6/22/05
|
The front 6/22/05
|
The front 7/12/05
|
The rear of the house . 7/12/05
|
The rear of the house . 7/12/05
|
Front of house
7/12/05
|
Front of house
7/25/05
|
Front Porch
7/25/05
|
Rear Porch
7/28/05
|
Front
Porch
8/25/05
|
Front
of House
8/25/05
|
Rear View
9/28/05
|
Rear
View
9/28/05
|
10/15/05
|
10/15/05
|
10/17/05
|
10/17/05
|
10/17/05
|
10/17/05
|
10/17/05
|
10/17/05
|
10/17/05
|
|
Revised 10/17/05
|