Our New Home  in 
St. Augustine, Florida 

Location


Directions


Plans


Progress
 


After the machines cleared the lot and removed all the limbs and trees another machione came in and cleared out all the small branches.  After that another machine leveled the lot and graded it from front to back.

2/23/05 -  Grading and staking the lot


Water spiket has been added so the concrete can be mixed.
The lot is graded and leveled. View from the Lake.
The lot is graded and leveled. View from the front.
View of the cleared lot from across the lake

The lot perimeter is staked out.
The cleared and staked lot.
Now we wait for the completed staking of the house site.
The house perimeter is staked.
 Revised 2/25/05